3 Way IP40 Metal Enclosure with 63A A Type RCD & 32A MCB (10kA)
This factory-built unit combines a 63A Type A RCD with a 32A 10kA MCB in a compact 3 way IP40 metal enclosure. Designed for fast fit-outs, it provides both earth leakage and overcurrent protection in one ready-to-install board. Suitable for use as a sub-main distribution unit, EV charging supply, or...
This factory-built unit combines a 63A Type A RCD with a 32A 10kA MCB in a compact 3 way IP40 metal enclosure. Designed for fast fit-outs, it provides both earth leakage and overcurrent protection in one ready-to-install board.
Suitable for use as a sub-main distribution unit, EV charging supply, or small three-phase circuit board, it ensures compliance with the 18th Edition Wiring Regulations and saves valuable installation time on site.
- Pre-assembled 3 way metal enclosure (IP40 rated)
- Includes 63A Type A RCD + 32A 10kA MCB
- Built to order – allow 3 working days from order
- Supplied complete with DIN rail and cover
- Complies with BS EN 61009-1 and BS EN 61439-3
- Ideal for EV sub-mains, commercial, and light industrial installs
What’s included in this unit?
The enclosure comes pre-assembled with a 63A Type A RCD, a 32A 10kA MCB, and a 3 way IP40 steel case.
Where can this board be used?
It’s commonly used for EV charger sub-mains, small commercial distribution, or any install where a compact RCD+MCB solution is required.
Is this compliant with UK wiring regulations?
Yes. It meets BS EN 61009-1 and BS EN 61439-3 standards and supports compliance with the 18th Edition Wiring Regulations.
How long does delivery take?
Each unit is built to order. Please allow up to 3 working days from order to dispatch.
- Enclosure: 3 Way IP40 metal case
- RCD: 63A Type A, 30mA
- MCB: 32A, 10kA breaking capacity
- Modules: 3 usable ways
- Standards: BS EN 61009-1, BS EN 61439-3
- Ingress Protection: IP40
- Build Time: 3 working days (custom built to order)
This enclosure is supplied pre-assembled with RCD and MCB protection. Installation must be carried out by a qualified electrician and in line with BS 7671 requirements.
- Confirm suitability for EV, sub-main, or distribution use
- Ensure enclosure is mounted in a dry, ventilated area (IP40 rating)
- Check all connections and test RCD operation on commissioning
- Allow sufficient clearance for cable entry and terminations